Has Rio Grande drilled the Winston Project?

Not yet. Work to date has been surface sampling, geological mapping, structural analysis, historical data compilation and airborne geophysics, carried out with Dahrouge Geological Consulting Ltd., which was engaged in November 2025. That programme is designed to prioritise targets for a Phase 1 drill program, which has not started. The high-grade numbers reported so far come from surface and dump samples, not from drill core.